What
is this $12,736,700 bond project for?
With this proposed project, the district
would renovate and update key areas of the Middle/High School,
as well as parts of the Elementary School, all to improve the
appearance and usefulness of both buildings, as well as achieve
full accessibility for persons with disabilities. Here are the
major upgrades planned within the project:
In the Middle/High School:
NEW
CAFETERIA ADDITION. A
nearly 9,500-square-foot addition would be built off the
Middle/High School music and technology wing to house an
expanded cafeteria and kitchen, giving students more room to
enjoy lunch and hold after-school activities. The current
cafeteria, located on the basement level of the Middle/High
School, is not accessible to students with physical disabilities
and, as a result, those students must eat lunch elsewhere. The
new cafeteria, however, would eliminate this problem. New
restrooms are also planned near the cafeteria.
Technology
classrooms. The
addition would also include new technology classrooms, designed
for instructing students in the most current areas of modern
technology, such as alternative power production and
computer-aided design (CAD), as well as the traditional areas of
woodworking and small engine repair. This classroom and
instructional equipment would be accessible to physically
disabled students.
Since
this addition would be built where the current student parking
lot is located, the student parking lot would be relocated next
to the soccer field behind the bus garage as part of the project
plans.
RENOVATED
GYMNASIUM. The
proposed project would expand the current gymnasium space to
create a corridor for easier access to gym locker rooms.
NEW
LOCKER ROOMS. Currently,
stairs provide the only access to the boys’ locker room,
located below the gym. Students with physical disabilities
cannot use it. Both the boys’ and girls’ locker rooms also
lack necessary space for sports teams to properly store
equipment and practice optimal hygiene before and after
practices and games. New locker rooms are proposed to be built
off the new gym, providing same-floor access and nearly 3,000
square feet of space for student use and sports equipment
storage.
RENOVATED
ART ROOM.
The current art room, located off the main lobby, cannot
sufficiently display artwork, store art supplies, or house
larger classes. As a result, art classes often take place in the
cafeteria or within a regular classroom, Middle/High School art
teachers say. This requires art teachers to transport sensitive
materials such as clay, risking damage to artwork. The new art
room would be located on the second floor of the Middle/High
School where the library and guidance office currently reside,
more than doubling its space. The guidance office will move to
the current art room.
RENOVATED
LIBRARY. Librarian
Beth Davis says she must close the library when a class is held
there due to lack of space. She often turns students away during
study halls and frequently monitors a waiting list for just
seven computers the library has room for. "It’s also
difficult for me to expand the book collection at this point
because we don’t have room for them," she says.
The
proposed project would move the library to the first floor next
to the music room, nearly doubling its current space. In
addition, a separate computer lab would be located off the
library to provide students access to more computers for
research purposes.
In the Elementary School:
Though
the most extensive improvements proposed in this project would
take place at the Middle/High School, a number of key
renovations are planned for the Elementary School, including
renovated bathrooms, an updated fire alarm system, and a new
Public Address system, all built to the most current
specifications. The elementary cafeteria would also get a new
roof.
Who
determined the improvements included in this project?
Members of the Facilities
Committee including parents, teachers, students,
administrators and community members helped determine the
current and future facilities needs of the district, then worked
to review and narrow down project options based on those needs.
After more than one year of review, the committee,
administrators and the Board
of Education approved the project up for public vote on
December 18.
Why
is accessibility for persons with disabilities a big part of
this project?
District
buildings – particularly the Middle/High School – do not
fully meet current state and federal accessibility standards for
persons with disabilities, and they need to, says Superintendent
Steven Schrade.
“Academic
achievement is impacted by more than just the teacher and the
student,” says Maureen Sikule, President of the Board of
Education. “When students feel connected to their school,
academic performance improves. Yet we have areas of our school
where students with disabilities cannot connect.”
BKW’s
buildings were designed and built during a time when providing
accessibility wasn’t federal law and little social awareness
on the subject existed.
The
age of the buildings – and the costs associated with updating
them – have made it difficult to get the timing right for
the large-scale renovation needed. That’s why the district has
performed, with approval from district residents, a number of
smaller projects that made some improvements without stretching
the wallets of district residents too thin. These completed
projects include the installation of elevators and lifts at both
the Elementary School and Middle/High School.
While
these smaller projects helped, they have not fully satisfied the
district’s ever-evolving accessibility needs.
The
number of students in the district classified with either a
learning or physical disability has increased to 214 this year,
up from 168 just five years ago, says Kimberly LaBelle,
Assistant Superintendent for Curriculum and Instruction. While
the number of students with physical disabilities at BKW remains
small, the district makes itself vulnerable to the possibilities
of losing state aid or subjecting itself to lawsuits the longer
it does not comply with state and federal accessibility laws.
“The
risk of incurring these kinds of needless costs is fully
avoidable by investing now in the cause to make our buildings
fully accessible to all,” Schrade says. “What’s more,
every student is entitled to the same rights and privileges.
When students in wheelchairs can’t eat lunch with their
friends in the cafeteria because that area is not accessible to
them, we’re doing a grave disservice not just to them, but to
our community.”
The
Federal No Child Left Behind Act mandates districts like BKW
make progress year after year educating students with disabilities.
Fulfilling this requirement becomes more and more difficult when
the facilities are not fully accessible to those students.
Where
will the money come from to fund this project?
A
combination of state building aid, EXCEL aid, a portion of the
district's capital reserve and a share paid by local taxpayers
will finance the project.
State Aid Reimbursement: $9,067,912
EXCEL
AID:
$ 340,008
Capital
Reserve:
$1,300,000
Local
Share:
$2,028,780
TOTAL
$12,736,700
How
much is this project going to cost ME?
As shown above, the local
share for this project would be $2,028,780. That amount would be
paid back over the course of 15 years. The district estimates
that the project would cost an AVERAGE $6 per year, or $90
total, for homeowners with a home assessed at $100,000 and
taking advantage of the STAR exemption. For seniors with the
Senior STAR exemption, the cost would average about $2.65 per
year, or $39.75 total, based on the same $100,000
assessed home value.
Obviously,
these amounts would be more for homeowners with homes assessed
higher than $100,000, and lower for those with homes assessed
lower than $100,000.
In addition, it's important to note this is an AVERAGE cost,
meaning the amount each individual would pay each year toward
the project will fluctuate between as little as 50 cents to
around $10. To most accurately describe what this project would
cost residents, the district opted to provide the average annual
cost amounts. Here are the average annual payments arranged by
town and STAR exemption type, based on a $100,000 home value:
| |
Regular
STAR |
Senior
STAR |
| Berne |
$6.00/yr |
$2.65/yr |
| Knox |
$5.86/yr |
$2.12/yr |
| Westerlo |
$5.49/yr |
$1.69/yr |
Will
this project affect the district's everyday costs?
Yes.
Once completed, the expanded space will increase utility usage,
e.g., heating and lighting. The district would also likely need
to hire a part-time custodian to help with maintenance needs
in the new addition.
However,
new facilities are always more energy efficient, so the district
expects any changes in heating cost to be minimal. In addition,
the planned reconstruction and insulation of the currently
uninsulated auditorium and gymnasium walls is expected to
yield long-term energy savings.
Cost-saving
measures enacted more than four years ago will also help the district
keep its utilities operating as efficiently as possible. As of
last winter, the district had saved upwards of $57,000 in maintenance
costs and heating fuel over the past three years, thanks to new
burners, boilers and energy-efficient temperature control
technology installed at both schools.
How
did the district determine the cost estimates for this project?
Administrators
enlisted the help of architect Karl Griffith, of the Schenectady
firm Griffith Dardanelli Architects PC, in the development of
the proposed project and its related costs. Working with the
architect, the district used cost estimates that allow for
anticipated market price changes in construction materials.
Why
is the district proposing this project now, especially when the
student population is declining?
Simply,
administrators feel the district cannot wait any longer for the
improvements without substantial risk of failing to meet
educational goals and honor legal obligations.
In addition, a combination of building incentives from the state
and the district’s own efforts to save money would provide the
improvements BKW buildings need at the lowest possible cost to
taxpayers.
“Several
years ago we as a community agreed to fund a reserve for our
school facilities for projects such as this proposal,” says
Board President Sikule. “Passing the bond resolution
authorizes the district to use that reserve, along with state
and excel aid, to partially fund the project and lower the
financial impact on our community.”
The
district is eligible this year for $340,008 in EXCEL aid (state
funding exclusively for building projects). The district may
lose this building aid if it’s not earmarked by the end of
this school year.
“These
improvements are needed, regardless of the number of students
attending BKW, “ Superintendent Schrade says. “But for
some time we hesitated to put a project like this before the
public because we didn’t want to overburden residents with
school-related costs. However, the current financial climate
enables the district to get the state aid reimbursement that
will keep the local share of the project costs as low as
possible.”
Why
not just put in a couple of elevators?
The district actually did look into this as a possible option,
and discovered that with this approach, the district would
receive LESS state aid reimbursement for the project, meaning
taxpayers would have to pay MORE to finance the project,
according to Superintendent Schrade. In addition, this approach
would not fully address the Middle/High School's accessibility
needs.
The proposed project needed to 1) meet all of the district's
current and future facilities needs, 2) bring the district into
full compliance with accessibility laws, and 3) cost as little
as possible to local taxpayers. Under the current proposal, the
district is not only achieving these goals, it is utilizing the
maximum amount of state aid possible. Ultimately, this option
gives its students the best building upgrades possible while
giving local residents the most bang for their buck, Schrade
says. |